CALL US

+86 17838360708

What is 1.54 in the dry volume of cement Quora

What is 1.54 in the dry volume of cement Quora

About this site

Answered 3 years ago In the preparation of design mix of concrete, we take the volume of dry concrete as 1.54 m^3 not the volume of cement. Volume of wet concrete is considered as 1 m^3 but in design mix we also calculate the water required and hence we take the dry volume of concrete which is 1.54 m^3.

get price

About this site

Dry volume percentage for concrete is 54%. So, For calculation, First of all you have to find out Wet volume of concrete required. For Example, Required wet concrete is 1 m³. Then, Volume of Dry concrete materials should be 54% extra. So, Total vo...

get price

About this site

M25 = 1:1:2 Total mix = 1+1+2 = 4 Dry quantity of one cum. Of C. Concrete = 1.54 Quantity of cement = 1×1×1.54 / 4 = 0.385 cum. Number of bag = 0.385/0.034 = 11.32 Say , 11 bag of cement. Thank-you

get price

What Is 1.54 In Concrete Calculation - DAILY CIVIL

The width of the concrete cube = 1 m. The height of the concrete cube = 1 m. Volume of concrete cube = length x Width x Height = 1 x 1 x 1 = 1 m³ (Wet volume) When we convert this wet volume into dry volume, the volume is increased by 54% of wet volume. ∴ Dry volume = Wet volume + 54% of Wet volume. = 1 + (54/100) x 1 =1 + 0.54 = 1.54.

get price

What is the weight of Cement bag? - Anything ... - Quora

Weight of cement bag is 50 kg or 35lit. Density of cement-1440kg/m3. Extra: Always use cement before 3month from the manufacturing date. Cement is grey colour with greenish shead. Cement is binding material. PPC is the best cement for building construction. Volume of cement bag.-0.035m3.

get price

What is the quantity of cement for a concrete beam 9in ...

Jul 07, 2020  Sol: ~~~8 Bags of 50kgbag cement We have been given a concrete beam of size 9 inch by 18 inch and a length of 37 feet. Also the mix ratio given is 1:2:4. Firstly we calculate the volume of the said beam. And this volume is converted into wet condition to dry condition.

get price

Can I get M25 strength of concrete using 43 grade ... - Quora

May 26, 2020  Given volume of concrete = 1m³. Wet volume of concrete = 1m³. For converting wet volume to dry volume to we will multiply 1.54 in wet volume of concrete. Dry volume = wet volume × 1.54. For calculation of dry volume we multiply 1.54 into wet volume. Dry volume = 1m³ × 1.54 = 1.54 m³. Density of cement = 1440 kg/m³. Mix ratio of mortar ...

get price

What Is 1.54 In Concrete Calculation - DAILY CIVIL

The width of the concrete cube = 1 m. The height of the concrete cube = 1 m. Volume of concrete cube = length x Width x Height = 1 x 1 x 1 = 1 m³ (Wet volume) When we convert this wet volume into dry volume, the volume is increased by 54% of wet volume. ∴ Dry volume = Wet volume + 54% of Wet volume. = 1 + (54/100) x 1 =1 + 0.54 = 1.54.

get price

Would building cement steps unto a wooden deck be ... - Quora

volume of concrete = 1 cubic meter(wet volume) therefore dry volume of concrete= 45% to 55% increase in volume x wet volume. dry volume = 1 x 1.54(assuming 54% increase in volume) dry volume = 1.54. cement quantity in 1.54 cubic meter concrete; in cubic meter =( part of cement in the mix / sum of mix ratio) X quantity of concrete = (1x 1.54)/10 ...

get price

What Is 1.54 In Concrete Calculation? - [Civil Planets]

Wet Volume of concrete = Dry Volume of concrete x 1.54. So whatever volume we get from the above formula, we need to multiply the value with 1.54%. So to get 1 m3 of wet concrete, we have to multiply the dry volume by 1.54. Consider M20 Mix Ratio (1 : 1.5 : 3) So total part of mortar = 1+1.5+3 = 5.5. Therefore, Required Volume of Cement = 1/5.5 ...

get price

What is 1.54 in concrete calculation?

Jul 02, 2020  1.54 is a factor that helps us to convert the wet volume of concrete into dry volume. If we transform wet volume into dry volume, then the dry volume is raised by 54% of wet volume.So that we can calculate the number of materials in dry condition. Let me make it clear by considering the concrete cube with dimensions as:

get price

What is 1.54 in concrete example solved Dry volume and ...

Jul 27, 2020  In this tutorial i have explained briefly what is 1.54 in concrete while analyzing the dry volume and wet vokume of concrete This video is about the conversi...

get price

What is the weight of Cement bag? - Anything ... - Quora

Weight of cement bag is 50 kg or 35lit. Density of cement-1440kg/m3. Extra: Always use cement before 3month from the manufacturing date. Cement is grey colour with greenish shead. Cement is binding material. PPC is the best cement for building construction. Volume of cement bag.-0.035m3.

get price

Dry Volume Formula, Wet Volume Of Concrete And Mortar In ...

Cement: Inconsiderable (because of fine particles) By summing up the percentage of aggregate and sand, we get 34% + 24% = 54% Dry Volume is greater than 54% of wet volume = 100/100 + 54/100 = 1 + .54 = 1.54 Because of that, Dry Volume = 1.54 x wet volume. Definition of 1.30 in the mortar. Mortar is formed with cement and sand.

get price

Dry and wet volume of concrete and their difference ...

Calculation of dry volume of concrete. Dry volume = wet volume (100/100+54/100) Dry volume = wet volume ( 1+0.54) Dry volume = wet volume × 1.54. if wet volume of concrete = 1 cum. Than dry volume will be 1.54 cum You Can Follow me on Facebook and Subscribe our Youtube Channel. You should also visits:-1)what is concrete and its types and ...

get price

How many cement bags, sand and aggregate (M20 gradeof ...

The cement requirement actually depends on the volume of concrete you are preparing. Let’s say you are preparing 1 Cubic meter M 20 grade concrete, now several other factors come into play. Depending on the mix proportion, cement content in the concrete varies.

get price

how much ratio of cement and concrete in m10

How much cement bags are used in M10 grade? - grade M10 = 1 : 3 : 6 ratio sum = 1+3+6 =10 let volume of concrete = 1 cubic meter(wet volume) therefore dry volume of concrete= 45% to 55% increase in volume x wet volume dry volume = 1 x 1.54(assuming 54% increase in .

get price

What is the difference between fine aggregate and coarse ...

The aggregates give the body to the concrete, and they also have a significant effect on the properties of fresh and hardened concrete based on their shape, size, texture, grading and crushing value. The voids created by the larger coarse aggregates are filled by the smaller coarse and the fine aggregates and hence, the volume of cement-sand ...

get price

ratio of cement aggregate sand in m m m

Aug 11, 2020  20/10/2020 In case of M 20 concrete, the ratio of cement, sand and aggregate is 1 : 1.5 : 3. Dry volume of concrete = wet volume of concrete × 1.54 [ You can take this factor 1.54 to 1.57 ] Hence, the dry volume of concrete is = 2 × 1.54 = 3.08 m 3 The required quantity of cement is = (Cement ratio ÷ Sum of all ratio) × Total volume of ...

get price

How to take out quantity of concrete for 1 cubic meter ...

Jul 25, 2021  The wet volume of concrete is 1 m 3 and the Dry Volume of Concrete is 1.54 m 3 (If you don't know what is the wet volume of concrete and Dry volume of concrete then Watch this video What is 1.54 and 1.33 in concrete How to convert wet volume to dry volume in concrete for full information with calculation examples) We assume Fine aggregate density is 1500 and Coarse

get price

What Is 1.54 In Concrete What Is 1.24 In Mortar ...

Apr 29, 2021  Dry Volume Of Concrete = 1.54 x Wet Volume Of Concrete. For 1 m 3 Of Mortar In Wet Condition. Void Ratio Compressibility of materials used in 1m 3 mortar. Fine Aggregate =20%. Cement =Neglected (due to fine particles) Wastage = 2-10%

get price

WHAT IS 1.54 IN CONCRETE CALCULATION ? CIVIL SITE VISIT

For converting Wet volume of concrete to Dry volume of material mix we multiply it by 1.52 to 1.54. From where it come , Concrete is mixture of cement, fine aggregate, course aggregate and water. When water is poured in cement and aggregate mixture the volume of dry mixture is reduced to some extent.

get price

What is 1.54 or 1.57 in Concrete Mix Design Calculation ...

Apr 25, 2018  and we know Dry Volumn is always greater than Wet Volumn. ( V dry > V wet ) Dry Volumn Concrete = Approximate 54 % to 57 % more than Wet Volumn Concrete. so, considering the factor of safety ranging from 1.54 to 1.57 to counter that shrinkage. i.e., Volume of dry concrete = 1.54 to 1.57 times Volume of wet concrete.

get price

what is 1.54 in concrete? – we civil engineers

Jan 27, 2018  I am a civil engineer, Currently working in Bharat petroleum corporation limited, It is one of the fortune 500 companies in world. View all posts by Kishan Mudavath. Tags: 1.54 in concrete, difference between dry volume and wet volume of concrete, dry volume formula, dry volume of cement mortar, dry volume of plaster, estimation and cost ...

get price

Cement, Sand Aggregate Calculation In Concrete

Aug 07, 2021  The volume of Dry concrete is 54%-57% of Wet volume of concrete. i.e. Dry volume of concrete = 1.54 * Wet Volume of concrete. Given, Wet Volume = 1 cub.m. Dry volume = 1.54 cub.m ( Dry concrete is 54%-57% more because there is loss during preparation and also concrete contracts after drying) For M20 Concrete. Cement : sand : aggregate = 1 : 1.5 : 3

get price

cement volumes for m grade concrete

How much cement is required in 1 m3 of concrete Quora. The requirement of cement in 1 m3 of concrete will depend on the grade of concrete suppose for M20 grade of concrete proportion is 1 1.5 3 volume of dry Concrete = 1.54 to 1.57 times Volume of wet concrete Lets assume 1.57 So volume of cement =ce. Chat Online

get price

WHAT IS 1.54 IN CONCRETE... - Civil Engineering ...

WHAT IS 1.54 IN CONCRETE CALCULATION?

get price

ratio of cement aggregate sand in m m m

Aug 11, 2020  20/10/2020 In case of M 20 concrete, the ratio of cement, sand and aggregate is 1 : 1.5 : 3. Dry volume of concrete = wet volume of concrete × 1.54 [ You can take this factor 1.54 to 1.57 ] Hence, the dry volume of concrete is = 2 × 1.54 = 3.08 m 3 The required quantity of cement is = (Cement ratio ÷ Sum of all ratio) × Total volume of ...

get price

Quantity and Rate Analysis for Reinforced Concrete ...

The dry volume of total materials required is considered as 1.54 times the wet volume of concrete, due to voids present in sand and aggregates in dry stage. Therefore, for our calculation, we will consider the total volume of materials required as 1.54 m 3 for 1 m 3 of wet concrete.

get price

how much ratio of cement and concrete in m10

How much cement bags are used in M10 grade? - grade M10 = 1 : 3 : 6 ratio sum = 1+3+6 =10 let volume of concrete = 1 cubic meter(wet volume) therefore dry volume of concrete= 45% to 55% increase in volume x wet volume dry volume = 1 x 1.54(assuming 54% increase in .

get price

how to calculate cement content in concrete m30

Wet volume of concrete = 1 m³. Dry volume = Wet volume x 1.54 (You can also take it as 1.50 to 1.55, But it became standard practice to considering 1.54 as multiplication factor). Dry volume of concrete = 1 x 1.54 =1.54 m³. 1- Find-out quantity of Cement. Quantity of cement = (Dry volume of concrete x cement ratio)/(sum of the ratio)

get price

How Many 50Kg Of Cement Are In 1Cum Of Concrete

Aug 03, 2018 Cement= (1/5.5) x 1.54 = 0.28 m 3 ∴ 1 is a part of cement, 5.5 is sum of ratio Density of Cement is 1440/m 3 = 0.28 x 1440 = 403.2 kg We know each bag of cement is 50 kg For Numbers of Bags = 403.2/50 = 8 Bags We Know in one bag of cement = 1.226 CFT. Read More

get price

Solved: What Is The Volume Of The Truncated Pyramidal Frus ...

What is the volume of the truncated pyramidal frustrum? If the concrete mix ratio is 1:2:3, how much cement is needed? (Use dry volume with k=1.54) If the concrete mix is 1:2:4, how much coarse aggregate is needed? (Use dry volume with k=1.54)

get price

How many cement bags and sand is required for M20 grade of ...

Jul 31, 2020  Mostly the ratio of 1:1.5:3 is used for M20 grade of concrete. So, Volume of dry concrete = 1.54 to 1.57 times volume of wet concrete. Assume, 1cum of concrete work ratio sum = 1+1.5+3 = 5.5. shrinkage or safety factor = 1.57. Total volume of wet concrete required is = 1.57cum. Volume of broken stone require = (3/5.5) * 1.57 = 0.856 m3

get price